Today Eos Group, Inc. announces the 2012 update to their High Voltage Database. The High Voltage Database is designed for use with Sage Timberline Office Estimating. The database supports construction cost estimating for utilities, owners, design engineers, and contractors in the areas of electrical transmission and distribution, and heavy industrial electrical systems.
Using the High Voltage Database, new clients can estimate a transmission line or a complete substation in under an hour. Existing clients can take advantage of 9 new alternate labor productivity tables for different installation considerations, as well as enhancements to in-plant conduit and wiring, which includes more choices and hazardous area wiring.