Today Eos Group, Inc. announces an end-of-year update to their popular 2012 High Voltage Database. The High Voltage Database is designed for use with Sage Estimating. It supports construction cost estimating for utilities, owners, design engineers, and contractors for electrical transmission and distribution, and heavy industrial electrical systems.
This release of the High Voltage Database features a new model to support rapid conceptual design and estimating for breaker-and-a-half substations and switchyards. Using this model, substation engineers and estimators can prepare a complete, detailed cost estimate for a substation in less than 10 minutes. The database also includes the addition of new labor and equipment resources to reflect the wide variety of construction trades and equipment used in high voltage systems. Existing clients will appreciate the numerous items for pad mount and pole mount service transformers (single-phase and three-phase) that were added to the database at their request.